Ok so the trenching team showed up to do the trenches and lay the water piping & electrical pipes. They said it should take them about 2 days.
A few questions regarding this and a couple other things:
1.) They are running 2.5" pvc pipe back to where my 8' ft. rain descent feature will be mounted on on Pergola about 7.5' ft. up. Also, 2" pvc to each of the 36" sheer rain descents on the 24" wall as per our design I attached. Is this OK pipe size? And should the suction pipes be 2.5" or 3"?
2.) I decided to do a single Pentair Intelliflo VSF pump since I will only filter at night from 10pm - 9/10am. When I run the waterfalls, the pump will run only the 3 waterfalls at the same time and nothing else. Will this work fine this way?
3.) We are doing KrystalKrete Quartz Verde color for our pool plaster. We are torn on whether to put the 1"x2" tiles show in the attached on our steps at all or do a single row of each tile or double the row up so it's 2"x2" sold band going across each step? These tiles are going on the front of our 3' rain descent water features.
Please help
Thanks!
A few questions regarding this and a couple other things:
1.) They are running 2.5" pvc pipe back to where my 8' ft. rain descent feature will be mounted on on Pergola about 7.5' ft. up. Also, 2" pvc to each of the 36" sheer rain descents on the 24" wall as per our design I attached. Is this OK pipe size? And should the suction pipes be 2.5" or 3"?
2.) I decided to do a single Pentair Intelliflo VSF pump since I will only filter at night from 10pm - 9/10am. When I run the waterfalls, the pump will run only the 3 waterfalls at the same time and nothing else. Will this work fine this way?
3.) We are doing KrystalKrete Quartz Verde color for our pool plaster. We are torn on whether to put the 1"x2" tiles show in the attached on our steps at all or do a single row of each tile or double the row up so it's 2"x2" sold band going across each step? These tiles are going on the front of our 3' rain descent water features.
Please help
Thanks!