- Jul 5, 2017
- 319
- Pool Size
- 22000
- Surface
- Plaster
- SWG Type
- Pentair Intellichlor IC-40
I am wondering why you can't start filling your pool after you acid wash it. Our pb acid washed our pool immediately after the plaster was put on and smoothed out and then he started putting water in the pool a couple of hours later. As I recall the pool was plastered in the morning following the acid wash to expose pebbles and take the cream off and then we started filling the pool in the evening. I wonder if our pb did not follow the correct install of the plaster however it is 8 plus years and we have not have any problems![]()
I think I worded that oddly. Yes they will fill right after they acid wash which he said would be done about 5 hours after the plaster was done. The only waiting period is we can not get in the pool for 3 days after plaster. I actually thought this was a little odd because I have seen a bunch of pics on build threads here with kids in the pool while it is being filled but maybe they just like to live on the edge