After having an above ground pool for two years, we finally decided to have a pool built. We are trying to be very budget friendly but everything is so expensive here, we got several quotes ranging from 60k-130k.
The bad? We have a tiny yard and decided to build essentially a pool covering our whole yard. Initially we were going to find a new home with either a pool already build or more land, but with interest as high as it is and having a 1.95% loan currently it just does not make sense to move.


Initial contract sign, May 2022, permits took a long time and did not come back until sept.
Some info from our builder:
JOB DIMENSIONS:
POOL:
STEEL REINFORCING:
POOL:
EQUIPMENT Hayward:
The bad? We have a tiny yard and decided to build essentially a pool covering our whole yard. Initially we were going to find a new home with either a pool already build or more land, but with interest as high as it is and having a 1.95% loan currently it just does not make sense to move.


Initial contract sign, May 2022, permits took a long time and did not come back until sept.
Some info from our builder:
JOB DIMENSIONS:
POOL:
- MAXIMUM LENGTH: 28'
- MAXIMUM WIDTH: 15'
- AREA (SQ/FT): 420’
- DEPTH: 3 ½ ” to 5’ or 6’
- MAXIMUM LENGTH: 6’
- MAXIMUM WIDTH: 6’
- AREA (SQ/FT) 36’
- DEPTH: 3 ½”
- DEPTH: 18”
STEEL REINFORCING:
- STEEL REINFORCING TO MEET LOCAL ENGINEERING CODES.
- EXPANSIVE SOIL SCHEDULE.
- #3-REBAR, 12” ON-CENTER STRUCTURAL STEEL
- FOUR #4-REBARS IN BOND BEAM CONTINUOUS AROUND PERIMETER INCLUDING
SURFACE SKIMMER (EXPANSIVE SOIL DETAIL) - REINFORCING STEEL TO BE ELEVATED TO A MINIMUM OF 2” ABOVE SOIL BY
CONCRETE SPACERS TO INSURE DISTRIBUTION OF GUNITE. (STEEL SECURED BY HEAVY DUTY TIE WIRE)
- PLUMBING WILL MEET ALL BUILDING AND HEALTH DEPARTMENT REQUIREMENTS
- ALL PLUMBING LINES WILL SCHEDULE 40, 200-PSI PVC PIPE. 2 1/2” ON RETURN LINES
AND 2” ON SUPPLY LINES.
- ALL EQUIPMENT WILL BE BONDED WITH GROUNDING WIRE TO SWIMMING POOL
STRUCTURE STEEL. - SUPPLY AND INSTALL ALL NECESSARY JANDY THREE PORT VALVES
- CONCRETE PADS FOR EQUIPMENT SETTING
- ALL SWIMMING POOL EQUIPMENT TO BE SET 50’ FT. FROM POOL.
- ALL PLUMBING WILL BE PRESSURE-TESTED THROUGHOUT CONSTRUCTION TO
INSURE LEAK FREE PLUMBING TO COMPLETION.
POOL:
- 2 - SAFETY MAIN DRAINS
- DUAL PORT SURFACE SKIMMER
- 1 - AUTOMATIC FILL LINE
- 2 - SAFETY DRAINS
- 3” CIRCULATION LOW WATER SHUT OFF
- 6 JETS
EQUIPMENT Hayward:
- HEATER 400K BTU
- CIRCULATION PUMP 2 HP
- CARTRIDGE FILTER 560SF
- HAYWARD LIGHT (2 Ea.)
- DEDICATED POOL VACUUM SUCTION PORT.
- BAJA SHELF WITH ONE UMBRELLA HOLDERS.
- THREE FEET OF PAVER AROUND THE POOL.
- ENTRY WALL REPLACEMENT:
- TO ADD 18” RAISED SPA
- UNDER COPING OVERFLOW DRAIN OUTLET
- COPING: POURED IN PLACE NATURAL GRAY CONCRETE COPING.