To be fair to PB, I went in eyes wide open. When we sat down to sign, we 'caught up' first. He was beside himself and literally threw a stack of 10 or 12 loaded folders, one per stalled build, across his desk in frustration and made a mess. He detailed not being able to get anything of a plastic variety. The concrete company kept blowing him off for jobs that were worth more with their limited supply. The ship went sideways. No help was on the horizon.
Then I asked him if he'd make it 13 stalled builds.
Then it went exactly as expected at which point the winter was unfavorable for building and dragged on a bit longer than usual.
Not keeping closer tabs on a terrible GC was on PB, but I now feel he got hit hard enough also, and we're 'even'
What was awsome was TFP to the rescue again. I saw reports here daily from around the country that NOBODY was finding skimmers, PVC, liners , etc. I had moral support coming out of my ears knowing it wasn't just me and I had no need to pester PB. He'd call me from time to time and I could hear the worry/panic in his voice as he updated me with what I already knew.
This place is bloody amazing. I should probably start helping out one of these days for all its given me.
Then I asked him if he'd make it 13 stalled builds.
Then it went exactly as expected at which point the winter was unfavorable for building and dragged on a bit longer than usual.
Not keeping closer tabs on a terrible GC was on PB, but I now feel he got hit hard enough also, and we're 'even'
What was awsome was TFP to the rescue again. I saw reports here daily from around the country that NOBODY was finding skimmers, PVC, liners , etc. I had moral support coming out of my ears knowing it wasn't just me and I had no need to pester PB. He'd call me from time to time and I could hear the worry/panic in his voice as he updated me with what I already knew.
This place is bloody amazing. I should probably start helping out one of these days for all its given me.