View attachment 84723View attachment 84724
My Stenner pump and my supply of 6% bleach. This is more than I will use for the rest of this season. I don't like to haul bleach. 2 trips a year is all it takes. The good thing is that at lower temps over the winter, the half life should be > 3 years. So it will still be OK to use next year. Just to be sure, I'll do a check on the leftover bleach strength next year.
I'm a Johnny-come-lately to this discussion but I believe my solution for 2019 is a Stenner pump as we have traded in our 18-ft. Intex for a house with a full-on, 18x36 in-ground behemoth. The days of dribbling a quart of LC in front of a return are over! I'm interested in doing more research on the longevity of 6% vs. the more concentrated (thus less to lug around) 12.5%, but I'm wondering if this is a photo of your setup and how far it is from your return line injection site? I have a spot is a basement that is probably six feet below and maybe 25-30 feet away from my pump/filter/return line. Could the whole Stenner setup be that far away from the injection site?
I think the average person should just synchronize timers.
That's me!