Pool builders turned up at 7am with a Bobcat and back hoe. Two dump trucks also turned up to take the dirt away. They were non-stop until about 3pm to get the pool dug.
We now have the basic pool dug out, next up will be the plumbers and trenching team to run the pipes in the next couple of weeks.
We now have the basic pool dug out, next up will be the plumbers and trenching team to run the pipes in the next couple of weeks.