the last issue, and I'm a little surprised the PB didn't notice it, was to join the 18" long bench with the first step off the tanning ledge. it seems silly to have a 2-3' section right off the tanning ledge that drops straight to the pool floor. I was thinking of just joining the 2 (bench and first step off ledge) into one continuous 18" depth and adjust the 2nd step off the ledge as needed. that might involve adding one more small step (like a half circle) in the middle of the 2nd step to get down to the required depth but seems silly to not connect them to me.
appreciate any thoughts/feedback.
View attachment 45116