Thank god, it is super dry here now and I had a tractor regrade the back yard to go with the layout of the pool. When clay is super dry in forms this super light dust that gets on everything. I can wait to be done with this and start rebuilding my backyard. At least I will have a pool to jump in to cool off.
any comments on the pool pad? It still needs some paint on the pipes, but I think it turned out good for my first time doing something like that. I only had a 3x7 pad to work with because of the space and the way the plumber payed out the pipes made it difficult to run everything.
will post some more pictures this weekend when I get back home. The concrete/ flatwork should be done.
any comments on the pool pad? It still needs some paint on the pipes, but I think it turned out good for my first time doing something like that. I only had a 3x7 pad to work with because of the space and the way the plumber payed out the pipes made it difficult to run everything.
will post some more pictures this weekend when I get back home. The concrete/ flatwork should be done.