I’m trying to set up an intex 16’x32’ and I ran out of time before a party tomorrow. The pool is basically ready to fill with water but I didn’t get a chance to dig out an area for the supports to be flush with the ground. I think I need a builders level and I don’t have access to one tonight.
One month from now I’m going on vacation for a month, and I was thinking of maybe draining the pool at that time.
Do you think I could try to fill the pool without supports, to use for a month, then drain it, go in vacation, and install supports when I come back?
Or am I am being crazy stupid?
One month from now I’m going on vacation for a month, and I was thinking of maybe draining the pool at that time.
Do you think I could try to fill the pool without supports, to use for a month, then drain it, go in vacation, and install supports when I come back?
Or am I am being crazy stupid?