Hello! I am new here and new to pools. I have installed a pool and am ready for finishing the pool plumbing and valves.
I have a Hayward EcoStar Variable Speed Pump and a 30" Hayward Top Mount Sand Filter 2"
My question is what is the best way to finish piping and what valves would I need? I piped the skimmers separate to be able to have a valve and shut (1) skimmer off when I am vacuuming the pool. Other than that I need some help. I would like the ability to turn the deck jets and future waterfall on/off separate than the returns.
Thanks in advance for any help!
- I have (3) returns tee'd together underground with (1) 2" stub up
- I have (4) deck jets all piped in 1-1/2" pipe with a loop system underground with (1) 1-1/2"
- I have (2) skimmers with no main drain.
- I have (1) 2" pipe stubbed up for a future waterfall.
I have a Hayward EcoStar Variable Speed Pump and a 30" Hayward Top Mount Sand Filter 2"
My question is what is the best way to finish piping and what valves would I need? I piped the skimmers separate to be able to have a valve and shut (1) skimmer off when I am vacuuming the pool. Other than that I need some help. I would like the ability to turn the deck jets and future waterfall on/off separate than the returns.