Do these numbers look okay for the start up phase of a new pool? We finished filling Saturday morning and have not yet been released from the startup company; pool school is scheduled for this afternoon. We’ve also had a ton of rain this week. Pump has been running 25/7 and water feature ran for about 3 days straight after fill.
FC - 3
CC or TC - 0 I think (the was only my 2nd time testing and I need to go more quickly between FC to CC)
pH - 7.2
TA - 40
CH - 350
CYA - I can still see the dot at the very top, but I know the pool startup co added tablets to raise. We had 0 in the fill water I tested.
The pool startup guy cautioned against using the tablets and higher CYA levels, which I already knew from TFP.
FC - 3
CC or TC - 0 I think (the was only my 2nd time testing and I need to go more quickly between FC to CC)
pH - 7.2
TA - 40
CH - 350
CYA - I can still see the dot at the very top, but I know the pool startup co added tablets to raise. We had 0 in the fill water I tested.
The pool startup guy cautioned against using the tablets and higher CYA levels, which I already knew from TFP.