Day one done. That operator has skills, I watched him work that track hoe like it was his own hand. Steel and plumbing today, looking at gunite Thursday or Friday (depending if the inspector can get out this afternoon)
- - - Updated - - -
Question on umbrella sleeves. Is this the size everyone recommends? If not I can change it, PB has to change the skimmers, sleeves and autofill to grey instead of tan, because everything on the pool is grey.
My beautiful dig turned into this today. Luckily they got steel and plumbing in yesterday and saw 2 days of non-stop rain coming and got it gunite flashed hours before a down pour.
Hope it dries up for you! Here we’ve been getting rain for a day or so then sunshine for 3-4days then rain again. It just can’t seem to stay dry. And it’s 40 one day and 80 the next. Gotta love Texas winters!
Oh I been watering, cleaning up the job site, apologizing to neighbors for a Saturday 6am gunite rig wake-up call.
only question I have is, tile is next and my PB said “see you Monday” when he left Saturday. Can they start coping that quick or do I need to go the whole “7 day” watering/curing?
Different pb do things different ways. Some even say to wait 30 days before tile. I am not 100 sure which is correct so will leave it to you to do some research and decide what you what to tell your pb.
Coping and tile today. 2-1/2 days after gunite was shot. PB insures me we will be fine, humidity running 50%+ and temps 45-65. The mans been doing it along time, guess we will go with it.