I am getting 3 quotes, of the samples I have seen I like the look and feel of quartz..Pebble would probably last longer but my wife thinks our normal concrete driveway hurts her feet
Interesting one company said I have major damage and it's an extra 5K but 2 other guys said possible but they didn't see anything to point to itand they are both pool builders so probably know.
Waiting on 2 more quotes and hoping to get on the schedule and get it ready to swim![]()
You'll likely get dramatically different quotes. When we redid our pool's surface the high bid was more than double the low bid. We settled on the mid-range bid because he had all the elements itemized whereas high/low had very generalized descriptions of work to be performed. So don't necessarily rely on them to "probably know" things.