Well after a nightmare of about three years with getting ripped off from my first pool company, to fighting the town over the mess they left, to finally getting permits issued to my new pool company!!!! It’s been a long fight but we are finally moving in the right direction.
We are up in the north east part of the country in northern Westchester, NY. We are getting an 18x36 gunite pool with auto cover, heat pump (no natural gas), SWG, 3 feet to 6 feet and about 1000 sq/ft unilock patio And Pentair equipment.
I’m looking for any and all advice on the build Such as:
What type of finish is best? Pebbletec or similar?
Pentair equipment models?
LED lighting (I think there was 2 in the plans?)
Will Unilock pavers stand up to salt water?
Any equipment or things I should make sure get installed when they rough in the plumbing/electrical?
Thanks for any help!!
We are up in the north east part of the country in northern Westchester, NY. We are getting an 18x36 gunite pool with auto cover, heat pump (no natural gas), SWG, 3 feet to 6 feet and about 1000 sq/ft unilock patio And Pentair equipment.
I’m looking for any and all advice on the build Such as:
What type of finish is best? Pebbletec or similar?
Pentair equipment models?
LED lighting (I think there was 2 in the plans?)
Will Unilock pavers stand up to salt water?
Any equipment or things I should make sure get installed when they rough in the plumbing/electrical?
Thanks for any help!!