Here is the completed equipment pad and automation system. This is my standard layout for most pools and I do it this way every time. Not only is it clean and functional but it integrates with the automation system seamlessly. I try to hide the wiring as much as possible and everything is run through conduit.
I went with all nicheless LEDs for this build (5 in the pool and 2 in the spa). I can't wait to see it lit up.


I threw that fence together as well since it had to be removed for tractor access.
I went with all nicheless LEDs for this build (5 in the pool and 2 in the spa). I can't wait to see it lit up.


I threw that fence together as well since it had to be removed for tractor access.