Construction started 2/3/20

After 8 day downtime between subs, back fill and wreck forms was today ... they finished after dark - I'll get more pics in the morning
 

Attachments

  • IMG_5124.JPG
    IMG_5124.JPG
    781.5 KB · Views: 161
  • IMG_5128.JPG
    IMG_5128.JPG
    712.6 KB · Views: 162
  • IMG_5130.JPG
    IMG_5130.JPG
    358.2 KB · Views: 158
  • IMG_5131.JPG
    IMG_5131.JPG
    719 KB · Views: 127
So close to being done now!! That is a lot of work done right there!

LOL on the chairs...............KIDS! :roll: and all of the shoes off.............no telling what they are doing to do or say next. You are going to LOVE how tired they are after swimming all day though!

What are you going to do to keep the raised dirt in place?

Kim:kim:
 
  • Like
Reactions: MikeFL
So close to being done now!! That is a lot of work done right there!

LOL on the chairs...............KIDS! :roll: and all of the shoes off.............no telling what they are doing to do or say next. You are going to LOVE how tired they are after swimming all day though!

What are you going to do to keep the raised dirt in place?

Kim:kim:
I had to laugh when I looked outside and saw the kids watching! As for the raised dirt, they are going to form and pour a concrete footer on the 3 sides away from the house to hold in the dirt and to hold the screen enclosure.
 
I don't think that will be a 12" deep sundeck, probably 8-9". The depth's mentioned are generally water depth - though you did specify gunite depth. Just wanted to make sure you weren't thinking the water would be that deep. Water depth (average) is to the middle of the skimmer. For sundeck depth, measure from about 3/8" above the gunite (thickness of plaster) to the middle of the skimmer opening.
 
  • Like
Reactions: MikeFL
I don't think that will be a 12" deep sundeck, probably 8-9". The depth's mentioned are generally water depth - though you did specify gunite depth. Just wanted to make sure you weren't thinking the water would be that deep. Water depth (average) is to the middle of the skimmer. For sundeck depth, measure from about 3/8" above the gunite (thickness of plaster) to the middle of the skimmer opening.
I agree on the actual 8-9" depth which is what we were shooting for ... would you say that 8-9 is typical for sun decks?
 

Enjoying this content?

Support TFP with a donation.

Give Support
9 day downtime between subs, they started on our footer yesterday and should finish today. Also we added 2 foot to the west side of the deck ... the walkway just before the waterfall was tight so I measured and the pool shifted 6" towards that wall. Builder only charged me price for 1.5 foot which I felt was fair.
 

Attachments

  • IMG_5169.JPG
    IMG_5169.JPG
    719.3 KB · Views: 66
  • IMG_5170.JPG
    IMG_5170.JPG
    837.7 KB · Views: 65
  • IMG_5171.JPG
    IMG_5171.JPG
    819.4 KB · Views: 66
  • IMG_5172.JPG
    IMG_5172.JPG
    729.9 KB · Views: 69
  • IMG_5173.JPG
    IMG_5173.JPG
    643.9 KB · Views: 67
  • IMG_5174.JPG
    IMG_5174.JPG
    646.7 KB · Views: 64
Looks like it was easy digging except for that one stump. Probably getting started on prime season for pool building down there. More deck space is always good!!
 
Looks like it was easy digging except for that one stump. Probably getting started on prime season for pool building down there. More deck space is always good!!

Good eyes, yes it took a couple hours to cut out that stump and rest was easy. I mentioned to our PM that rebar wasn't in this morning, he had expected them to form the rebar and the pour the concrete but that didn't happen. Concrete truck pulled up an hour ago and they poured followed by inserting the rebar in after the fact. My PM said that is not his preference but since we are only going up a couple blocks and we are at 4K PSI we will not notice.
 
Footer poured, Tile installed, Coping Delivered
 

Attachments

  • IMG_5178.JPG
    IMG_5178.JPG
    828.9 KB · Views: 87
  • IMG_5179.JPG
    IMG_5179.JPG
    522.6 KB · Views: 90
  • IMG_5185.JPG
    IMG_5185.JPG
    690.6 KB · Views: 93
  • IMG_5186.JPG
    IMG_5186.JPG
    567.4 KB · Views: 84
  • IMG_5187.JPG
    IMG_5187.JPG
    622.7 KB · Views: 84
  • IMG_5189.JPG
    IMG_5189.JPG
    711.5 KB · Views: 82
  • IMG_5191.JPG
    IMG_5191.JPG
    649.1 KB · Views: 76
We are 1 month into the build, yesterday's update: Start on coping and pool equipment installation.
 

Attachments

  • IMG_5218.JPG
    IMG_5218.JPG
    503.7 KB · Views: 114
  • IMG_5219.JPG
    IMG_5219.JPG
    518.3 KB · Views: 113
  • IMG_5220.JPG
    IMG_5220.JPG
    586.5 KB · Views: 109
  • IMG_5221.JPG
    IMG_5221.JPG
    375.9 KB · Views: 101
  • IMG_5222.JPG
    IMG_5222.JPG
    364.8 KB · Views: 114
  • IMG_5223.JPG
    IMG_5223.JPG
    353.2 KB · Views: 126
  • IMG_5224.JPG
    IMG_5224.JPG
    685.3 KB · Views: 124
  • IMG_5225.JPG
    IMG_5225.JPG
    325.3 KB · Views: 107
  • IMG_5226.JPG
    IMG_5226.JPG
    462.7 KB · Views: 92
  • IMG_5227.JPG
    IMG_5227.JPG
    317.1 KB · Views: 83
Just curious - why does the footer look like it's so far below the sand it's supposed to hold in? Is the sand being lowered, or is something else going on top of the footer to keep the sand in? Or is this just an optical illusion? :)
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.