SR Smith pool slide gap between flumes

The lower part looks higher, so that will be felt.

It just needs to be done exactly right, is that too much to ask?

full
 
  • Like
Reactions: proavia
Kids slide down carpeted stairs for Pete's sake. A 3/4 inch wet 'stair' won't even be felt.

Now if it was sliding 'up' a 3/4 inch step, that would be felt
I honestly didn’t think about the water on the slide. Just simply saying you can feel the transition. If that’s not an issue then I won’t make it an issue. I almost have to be hyper vigilant about this pool because not one issue has been caught by anyone but us and remember I’ve never built a pool.
 
  • Like
Reactions: Newdude
If that’s not an issue then I won’t make it an issue.
The flow of water may be an issue. The water needs to be moving fast enough to jump the wide gap, or it may go upward instead. It may be difficult to dial in, or not even possible with the water pressure lower out at the slide.

Screenshot_20230909_121644_Chrome.jpg

I don't feel the bump will be an issue for the rider, but I'm a hard hat, not a slideologist. 😁
 
Want to make sure I’m good. I have a water truck delivering water. They’ve delivered a load so far. Does this look right? I assume it’s probably from the plaster but wanted to check! The guy said it’s not oil, they don’t haul oil.
 

Attachments

  • 2FDD9BEC-A5DF-490C-A303-881EDAD8A1FE.jpeg
    2FDD9BEC-A5DF-490C-A303-881EDAD8A1FE.jpeg
    416.9 KB · Views: 37
It’s probably just crud and junk from the construction process. Wait until the pump gets running and you suddenly find chucks of cement and plaster sitting in your pump strainer basket. The guys try to keep the pipes sealed up during construction but junk always makes it through. The oily sheen could be from the light housing or wire lube used to pull cabling through conduit.

It’s basically a very dirty start up process. It should all level out in due time.
 
  • Like
Reactions: Kwitttx
Ask your Builder or SR Smith for a reference of someone who has the same model slide as you do.

Arrange a road trip of whatever distance to see how the slide was assembled.

You need to see how your slide assembly compares with another installation.
 
Last edited:
Ok there are some brown lines on the plaster just wanted to make sure.

Could be trowel marks. Hard to tell. Unfortunately you have to fill the pool and get the water balanced out for at least 30 days during the startup period to see how the plaster looks. It can change appearance quickly over that time. Just make sure you are following whatever startup procedures you were given and follow the pool builders start up method. They are accountable for the pool until they throw you the keys and satisfy your final punch list of items. Once they get that last paycheck, they’re gone … that can be both good and bad.
 
  • Like
Reactions: Kwitttx

Enjoying this content?

Support TFP with a donation.

Give Support
This is what the skimmer looks like but water is not yet filled up to the skimmer, still over a foot away.
 

Attachments

  • EC0D2760-D809-43C4-B105-7CC1379F18AD.jpeg
    EC0D2760-D809-43C4-B105-7CC1379F18AD.jpeg
    332.5 KB · Views: 22
  • 213F7B6C-6212-42DA-B465-ADDAACEEA151.jpeg
    213F7B6C-6212-42DA-B465-ADDAACEEA151.jpeg
    894.3 KB · Views: 22
There is a lot of junk that can get into the plumbing especially if the plumber takes several days to finish or they leave their pipes sitting around the yard. Bugs and rats love to nest in empty open pipes. There’s also debris during construction as well. All of that should have been blown out during pressure testing but that’s not always a given.

The pool has to fill and the equipment needs to get started up before any of this will sort itself out.
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.