Moving cell to horizontal versus vertical as vertical it's bottom connection is below ground level. How do I cut and reuse the bottom union portion. Doesn't look like something stores just carry (or maybe they do). Do I cut a length before the cell connection and then just use a union on the old pipe?




Last edited by a moderator: