Re: Spring Texas, Contract Signed! Will still need advice along the way!
Those windows will have the perfect view of the pool. Very nice.
Those windows will have the perfect view of the pool. Very nice.
[/URL]![]()
24 hours of progress! Does all look well with these pics?
whats with the four drains rather than two?
[/URL]![]()
also is that a raised fire feature wall you have there already or is it a planter?
My PB added redundant drains in case one gets clogged...one set is for the filters and the other is for the water feature.
Yes...that is an existing raised fire feature!![]()
Thank you! Super excitedThis is looking soooo good!!!
More progress! Plumbing, electrical, equipment pad, coping, tile and waterfall were put in over the past couple days. I feel like this is pretty good progress considering the bobcat showed up to dig only 10 days ago. I am going to get serious about educating myself on the trouble free method and the function of my equipment. Here are some pics of what I've got! Any and all feedback is welcome!
Equipment Pad
Really looking forward to decking to cover up all of the exposed dirt and dust. Also looking forward to the mess inside the pool getting cleaned up. I am told they'll powerwash it with bleach. I also added 61 sq ft more decking to the design.
Also, I am going with Blue Surf Pebble Sheen. Thinking about adding a browner color to the sun deck? Any opinions on this?
Thanks folks!
Yes, it appears they added a separate power panel with breakers for the pool systems directly under the main power box. I didn't request this. I have no idea how they decided how they would do it. Hoping it works well.so did they tap directly off the existing power incomer (top center of your pic with the LCD meter) for the home there? Thus avoiding the existing power panel in the house / garage all together?
Nothing wrong with that, just that it might be an option for us that I had never considered.
Yes, it appears they added a separate power panel with breakers for the pool systems directly under the main power box. I didn't request this. I have no idea how they decided how they would do it. Hoping it works well.
Wow, Sunny! I don't know how I missed your thread! Looking great!! We're your neighbor in Cypress and should be starting our build this month. Excited for you on all this quick progress!!
Sent from my iPhone using Tapatalk