Been playing tinker toys with layout of my new equipment & pvc for my pad. Unfortunately have had a ton of rain, so had to create a mock up inside 'cause there's a lot of tweeking to get all of it inside the small area and still be easy to use. Have pretty much settled on the layout, but have had to order some pvc fittings not available locally so that's going to delay me another week or so.
In the meantime and between t-storms, have been getting electrical updated and doing general cleanup in the actual pad. And parts shopping - talk about a time sink.

Example: took 3 days going to 4 HD & 3 Lowes in 3 towns to get most of the pvc that I initially thought I'd need. Jeez.

How I miss my favorite plumbing supply that closed when the owner retired.
Today I scooped half of the pool for the first time since the last post. Mostly just a little muck and very few new leaves, so am really glad about that. Plan to do the other half tomorrow.
Starting to acquire chems. Currently have 51 gals of 10% chlorine (date 20123). For grins, ran the tests so I could determine what other pre-SLAM chems I'll need.
--No chlorine
--Ph 8.2 or above
--CYA 0
--CH 150
--TA 140
Have to wait until equipment is operational to add chems, but going to get a couple of gals of muriatic acid to bring down Ph and have ordered liquid stabilizer (no desire to squeeze sock in algae soup that may or may not still be home to my snake

)
Also did a check for ammonia and
maybe there's a little, but doesn't look like I'll be facing a huge drain on my chlorine to combat it.
That's all for now.
