Today was gunite day, so they arrived early this morning to get started. I wasn't able to be out there to watch them work, but once they finished I went outside to look and they got the steps wrong. Apparently there are two sets of plans floating around for our pool, which is a whole other issue. It's supposed to be two full steps, with a half third and half fourth step on the right hand side. The intent was that the second step would act more as a bench on the left hand side. Instead, they gunited three full steps and half fourth step on the left hand side. They say they will fix it, but will this affect the structural integrity of the half third and half fourth steps once they add them to the correct side on the right? What if they come loose or if the plaster separates at the joint?