That coping work is gorgeous! If you don’t mind saying, who was the cement company that did that work? (We are building a pool in norcal with cantilever decking/coping in the spring and need a good reference).
Sorry for the delay - I’ll PM you the info!
Further progress! We had the second patio pour completed Wednesday, and final patio and pad pour today. The crew did an amazing job and it looks incredible. The center small circle has the same sponged circular effect as the coping and looks great.
One thing you’ll notice is some wood in the gap where old patio meets new. Our builder is super creative, so he poured a gutter below the concrete and then left a 1/2” gap to serve as the drain. Water rolls back and drops over the rounded edge into the gutter which slopes to a drain. Will try and add a picture later of the side profile, but it’s really cool and doesn’t require a standard linear drain.
Next up: equipment install (should be next week) and Pebble Sheen is scheduled for August 3. I think we are leaning towards Blue Granite with shimmering sea.
So close!





