Howdy everyone.
We want to express our heartfelt gratitude to everyone for the valuable advice and insights shared on this site. Spending time here has elevated our understanding beyond the novice level, giving us the confidence to tackle what needs to be done.”

Of all of the PBs we've talked with, we found one that worked with us on the design (and still working) however their contract is a mess. Posting here with the hope you can let me know if we're missing anything that should or should not be in the contract. This project, to us, is fairly large and we find it challenging to stay on top of it all. We've tried to read as much on the forum as we can to reduce the same redundant questions and apologies if we've missed something.
Thank you in advance for your input.


We want to express our heartfelt gratitude to everyone for the valuable advice and insights shared on this site. Spending time here has elevated our understanding beyond the novice level, giving us the confidence to tackle what needs to be done.”


Of all of the PBs we've talked with, we found one that worked with us on the design (and still working) however their contract is a mess. Posting here with the hope you can let me know if we're missing anything that should or should not be in the contract. This project, to us, is fairly large and we find it challenging to stay on top of it all. We've tried to read as much on the forum as we can to reduce the same redundant questions and apologies if we've missed something.
Thank you in advance for your input.

