Baby steps. More electrical getting done, most importantly my equipment pad light. Was out cleaning the filters last night using my phone to see, wasn't fun. Wasn't concerned about this wall showing conduit since its on the utility side of the house but still some obvious (to me) short cuts in how they run conduit (would have run the switch conduit much lower so not in line of site). I wish I could be able to baby sit them but just isnt possible all the time. However again not going to ask for changes as I'm glad its getting done and this is not an area im concerned about vanity. I need to adjust the light though, the OCD in me is annoyed the heads aren't straight lol.
Still moving slowly but not going to complain other than I'm ready for my house to not be in disarray. They were hoping to pour concrete end of the week but I dont see that happening, since theres still a boat load of concrete forms to do, but especially with remnants of Ian headed our way this weekend, Not expecting anything severe just a lot of rain which could be nothing or could be a gully washer. Local news says plan on 1-6 inches so that will be fun.
Still moving slowly but not going to complain other than I'm ready for my house to not be in disarray. They were hoping to pour concrete end of the week but I dont see that happening, since theres still a boat load of concrete forms to do, but especially with remnants of Ian headed our way this weekend, Not expecting anything severe just a lot of rain which could be nothing or could be a gully washer. Local news says plan on 1-6 inches so that will be fun.