Sorry to hear that!We ran into several delays with permits and getting a variance. After that ordeal, we learned our property survey (which the PB based the plan on) was wrong. The pool was supposed to be complete around the 4th of July, but we haven't even broke ground yet. If we get an amended permit soon, we should be able to excavate on Wednesday. It's been frustrating to say the least.
Dig done in 3 days? Nice!
Let the mud begin!! If they say they are done go out there with the plans and a tape measure. Is it long, wide, deep, etc enough? Add about 8" for the steel, shell, and plaster.
Thank goodness for tape measures! Now if they had used it LOL