You will need the pump running and a FAT wallet you don't mind being almost empty with how much the heating may cost.
What if I heated the pool for a couple months before closing and then frequently checked the ph
or do you need the pump running to adjust ph?
I’m surprised the plaster company didn’t warn me.
One of the startup instructions says no running heater (for my gas pentair) for 30 days after plasteringThanks for the advice. I’m surprised the plaster company didn’t warn me. I have a gas pentair heater and will have an automatic pool cover but either way it sounds like I should hold off on plaster until spring.
One of the startup instructions says no running heater (for my gas pentair) for 30 days after plastering
I think the better question is WHAT will stick to the icf? See plaster needs something "rough" to stick to. How does icf feel? Can it be roughed up?Will pebble really last longer then plaster?
Will pebble really last longer then plaster?
Do you mean the icf panel? I probably should have but I didn’t. There wasn’t any room between the icf and the dirt wall. As far as sealing the concrete I plan to do that but have to wait for the concrete to cure longer. I have used cure n seal on concrete in the past but the concrete specialty store was out and thought it might make the deck more slick.awesome job. did you waterproof the exterior panel?