Got some tile down today and then it started raining so they packed up and left. It was 5 o'clock anyway.
They used the hard foam insulation as a tile support nailed to the shell. I was impressed with that idea as I was going to use the more rigid PCV edging for that back when I was going to DIY that part. I’m also impressed they are using a notched trowel and not just dabbing the back of the tile with thinset and pressing it in place. I guess that’d be hard to do with the smaller tile anyway, but still nice to see good workmanship without thinset squeezing out of all the joints.
View attachment 527606
And they only have a few more to go. Hopefully tomorrow they’ll finish up with the tile. There was a part in my timelapse video where they made a phone call after using the laser level to mark the height for the foam board. I’m wondering if that’s when they noticed the pool is slightly out of level and called the boss to figure out what to do.
View attachment 527607