I started a new project trying to level out the existing deck around our pool rather than trying to find a contractor to replace it. I guess all the concrete guys are rolling in cash right now cause they won’t call back.
Here’s the first one that I was able to raise up level with a hydraulic jack along with a tool I built to avoid digging out under the slabs. You can see the slab I raised is now a couple inches higher than the adjacent one at the back edge.

It gets worse as it goes towards the back of the pool which looks like it was built on fill dirt.
Here’s where I’m at now after raising 8 sections. There’s about a 6 inch drop at the back of the slabs in the worst area.

Plan is to get them all close to level, then a few of them need to be shifted back toward the edge of the pool since they’ve slid back a few inches. Once they’re in place where I want, I need to decide if I want to just try and backfill under them with gravel or try and fill the voids with non-shrink cement grout. Any advice on that front is welcomed.
Here’s the first one that I was able to raise up level with a hydraulic jack along with a tool I built to avoid digging out under the slabs. You can see the slab I raised is now a couple inches higher than the adjacent one at the back edge.

It gets worse as it goes towards the back of the pool which looks like it was built on fill dirt.
Here’s where I’m at now after raising 8 sections. There’s about a 6 inch drop at the back of the slabs in the worst area.

Plan is to get them all close to level, then a few of them need to be shifted back toward the edge of the pool since they’ve slid back a few inches. Once they’re in place where I want, I need to decide if I want to just try and backfill under them with gravel or try and fill the voids with non-shrink cement grout. Any advice on that front is welcomed.