- Jun 23, 2012
- 1,054
- Pool Size
- 16000
- Surface
- Plaster
- Chlorine
- Liquid Chlorine
- SWG Type
- Pentair Intellichlor IC-40
In February our pool equipment froze due to the loss of power for a couple of days. Replaced the VS pump, the multi-port unit, the booster pump, various pipes and am still waiting on the DE filter to arrive hopefully next week. I don't know about the heater yet... AND this week I have a green pool. Here are my readings:
CYA - 100
PH - 7.8
FC - 3
CH - 475
TA - 80
I ordered a robot that should be here any day. (I didn't even know those things existed until this week..) Can I run the robot before the pool is up and running? I'll need to drain the pool quite a bit before I slam, right? Is 30 - 60 my target CYA? Thank you in advance.
(I have an appt, but will be back here tonite.)
CYA - 100
PH - 7.8
FC - 3
CH - 475
TA - 80
I ordered a robot that should be here any day. (I didn't even know those things existed until this week..) Can I run the robot before the pool is up and running? I'll need to drain the pool quite a bit before I slam, right? Is 30 - 60 my target CYA? Thank you in advance.
(I have an appt, but will be back here tonite.)