Well I've joined you in that faux pas. Had a leak in the skimmer line entry into the pad before the new jandy ball valve replacement. One joint had to be glued after everything else was positioned...

Good thing I was just adding a little water to the pool at a time for testing.
------------
Still plugging away at least 3 hrs/day in 100+ temps. When you're young, everything
seems to take forever; when you're old, everything
does take forever.
Actually have made a lot of progress, but it's little things that don't show much or not at all.
--Used leaf blower to check all pool lines into pad except main; used a pancake compressor for the main. All clear.

--Screwed together paver stack used under filter and added filter positioning guide.

--Added stopper block so filter joint band doesn't fall very far when loose.

--Added more irrigation valves and finished rerouting water lines for hose bibbs on walls outside of pad.

--Added hose bib & hose specifically for cleaning filter inside pad.

--Reinstalled one of the irrigation timers.

--Got pool water filler via irrigation valve & timer operational.

--Finished all high voltage wiring except a distant outlet that's powered from the IntelliCenter.

--Tidied up wiring runs.

--Fixed the little fountain on outside of pad wall that will be relay-controlled.

--Removed old pool light & pulled wire for new one.

--Added 1 ft of clear pvc as a viewer to drain line.

--Drain/waste module done, painted & and gravity tested.

--Filter module done, painted and ready to install after skimmer leak fix verified.

--Pump module being worked on. 🛠
Will have a nice set of pics hopefully in a couple of days.