So, finally completed. Whew, that was quite the project all in all. I sure appreciate all of the help that I received from everyone. The photos above posted earlier in this thread, was the initial plumbing and electrical completion back in September , but I had yet to integrate the IntelliCenter automation, IntelliValves, IntellipH and a few other minor additions to the overall system.
Anyway, here is my completed "project" photos (don't hate me too much Jim, you were the one who gave me a some of these ideas )
Load Center with IntelliCenter Install
Plumbing and Electrical
Low Voltage and Line Voltage Junction Boxes, Water Meter Enclosure and IntellipH Controller
Temperature Probe wrapped in Foam Insulation
Anyway, here is my completed "project" photos (don't hate me too much Jim, you were the one who gave me a some of these ideas )
Load Center with IntelliCenter Install
Plumbing and Electrical
Low Voltage and Line Voltage Junction Boxes, Water Meter Enclosure and IntellipH Controller
Temperature Probe wrapped in Foam Insulation