I have the inteliconnect automation box, should I use one of the relays to power the cell? Or the wire together with the pump so that it only runs when the pump is on?
The manual shows it wired to the main panel.
I assume it is smart enough not to run in a no flow situation either way?
The manual shows it wired to the main panel.
I assume it is smart enough not to run in a no flow situation either way?