First thank you to all who have shared their experience and knowledge on these pages. After 5 months of reading this website, interviewing builders, stressing and discussing, we have chosen a PB and received the first drafts of the design. Not only is this our first home purchase, but also our first pool. GO BIG or GO HOME, right? I am attaching the details and aerial picture.
Feel free to give us advice, suggestions, pretty much anything!
Edit: Deleted: ozone, 1 light, aqua vac, Aqua LinQ, auto-chlorinator
Feel free to give us advice, suggestions, pretty much anything!
Edit: Deleted: ozone, 1 light, aqua vac, Aqua LinQ, auto-chlorinator
Pool 32’ x 18’ |
Rock Excavation |
Pool depth 4ft to 6ft |
Pool benches |
Beach Ledge |
Double steel |
Pool foundation beam |
Plumbing & Electrical – rock excavation |
Automatic Pool filler |
Clear lights (changing this to one light in the deep end) |
Valve Actuator |
TriStar HP |
Hayward TriStar 2.70 HP VSP pump |
Hayward C200 Cartridge filter (pool is 16,900 gal.- how big should this be?) |
Umbrella Sleeve |
Waterline Tile-band |
2” Flagstone Coping freeform Tier 1 |
StoneScapes Pebble Finish |
Bubbler Fountains (should this be only one?) |
3 sheer Waterfall |
Natural Gas to Heater Plumbing |
Excavation for gas line |
House regulator |
400K BTU UnivH-series Heater |
1st payment 10% at contract acceptance |
2nd payment 20% at excavation |
3rd payment 20% at Pool Steel Plumbing |
4th payment 25% at Shotcrete-Gunite |
Final Payment is 25% at job completion |
Attachments
Last edited: