We have our decked poured, now have to wait till Monday for the stone guy to comeback and lat the stone for the deck step. I wish I could get a couple good days in a row with work getting done. Looks like a messy back, side, and front yards for Easter.


8595552463_90c9e9d909.jpg


8596661420_01648a5b28.jpg


8595557725_b5919d4fd4.jpg
 
Re: Under construction in McKinney Tx

Looks great! I hear ya! We are plastering tomorrow finally and my fire pit still needs to be built.. and spray deck... so those should happen early next week, but I am not sure why it has to wait? But, really, we are ok as the pool is the main part to get going...
 
Re: Under construction in McKinney Tx

When we built our last pool, it was work one day, then nothing for two days; work one day, nothing for two more days, sometimes more. It was one of our biggest frustrations, but I heard from many experts that no PB does it from start to finish on one job continuously. Same thing with this pool renovation - You see a flurry of activity to start, then the crew is pulled off your job to go start another job. Then back, then off again. I have some plaster still to be chipped off, and the tile guys can't finish their work until that happens. ALL of the plaster that's been chipped off is still in the bottom of the pool - I guess the plaster guys will take it out.

At least it looks like most of the tile will be on today, and the stone crew is cutting the pea gravel for the coping. I expect tomorrow will be a dead day (it may rain), because I've seen one crew or the other for 3 days in a row. I think any construction company does this - juggle jobs and crews for maximum results/payout.
 
Re: Under construction in McKinney Tx

Good news that they will now come tomorrow and start cleanup. Monday they will do the last part of stone work and start landscaping beds on Monday.
 
Re: Under construction in McKinney Tx

but I heard from many experts that no PB does it from start to finish on one job continuously.

An insider once told me that the reason for this behavior is once the draw for the gunite has been made, most of the profit for the build has been captured. There is no sense of urgency after that point.
 
Re: Under construction in McKinney Tx

bigdav160 said:
but I heard from many experts that no PB does it from start to finish on one job continuously.

An insider once told me that the reason for this behavior is once the draw for the gunite has been made, most of the profit for the build has been captured. There is no sense of urgency after that point.

That sounds right. I went back and looked through my file on the pool we built, and it was 4 mos. from contract to final sign-off, almost 5 mos. We signed the contract in June and weren't swimming until October. Now, granted, we had some challenges - the access was difficult and the dig was in a tight spot; had to re-route the sewer line; move the AC unit about 15" - but those were not insurmountable. It really did take too long. Of course if we had started in the off-season, we wouldn't have had such a long process.
 
Re: Under construction in McKinney Tx

Txsteel, what happens next? I know your anxious! We still have spray decking and build fire pit, pool school etc. They were supposed to do those items early this week but rain is in the forecast so may be delayed. But, I am ok cause we have water!! We are on a time line for my son's 5th birthday party on 27th... we moved it our due to having to wait the 3 weeks to be able to heat the pool and a tball game on the 20th! So, we shoud be ok. You are so close!
Remind me.. are you doing salt?
 
Re: Under construction in McKinney Tx

Texgirl,
This week is finish a small amount of stone work, landscape beds, sprinklers and then planting. They also need to set and hook up equipment, run auto feel line and final electrical. Then it will be time for Pebblesheen and sod.

Yes we went salt. I have a guy lined up to seal all the stone and concrete after it is complete. Everyone complains about the flagstone eroding because of salt. That's the nature of the stone, I already see places the new stone has eroded.
 

Enjoying this content?

Support TFP with a donation.

Give Support
Re: Under construction in McKinney Tx

Thats great you are getting all your landscaping done at same time. Was this all included in your pool? If it was thats great! We are doing ours seperately. They came to work on extending our fence on the side where the pool equipment is. We should have enough space for a small storage unit. We got spray decking today so now just have to build fire pit, install slide, get equipment working properly and we are done!

I posted some pics... check them out! KIM
 
Re: Under construction in McKinney Tx

Texgirl,
I seen your latest picture. Your pool looks great. The landscaping is separate, but he works with the pool builder as well as the irrigation guy. What I like about that is they all communicate so they each know what is happening next and where everything is going to be.
 
Re: Under construction in McKinney Tx

It's amazing how much better things looks with just adding a little landscaping. Now I need to rain to hold off for a while so the can finish the landscaping and pool.
8616384461_83725639fc.jpg
 
Re: Under construction in McKinney Tx

I was curious what kind of decking you have? We have an extension of our patio that we did a few years ago that is stamped concrete -- and we are looking to do sundeck for our decking. I was worried it would look strange having 2 different materials next to each other.
 
Re: Under construction in McKinney Tx

Cajun,

Yes, there will be a stone step with the face being a the block stone like the wall covered with flagstone.

TxALH,

We went with a plain heavy texture stamped concrete in a neutral beige color.
 