I have a trichlor chlorinator connected to my return line. I don't want to remove it and throw it in garbage as I already have it and I see some situations where I could use trichlor occasionally.
Following this, on the return line, I would like to install the injection for liquid chlorine with the Stenner pump.
If I ever have both working at the same time, is it causing an issue?
Following this, on the return line, I would like to install the injection for liquid chlorine with the Stenner pump.
If I ever have both working at the same time, is it causing an issue?