- Jun 10, 2022
- 19
- Pool Size
- 16100
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Hayward Turbo Cell (T-CELL-5)
Hi,
We have asked our PB to redo our tile work on the spillway between our pool and attached spa two times for our pool remodel. We are curious of your assessment (quality, longevity of current condition of tile work, etc.) of the work done the second time? Would you recommend bullnose corners in the future? How hard would it be to redo the tile in the future without our new pebble plaster job being disrupted or completely draining the pool?
Thank you very much for your suggestions.

We have asked our PB to redo our tile work on the spillway between our pool and attached spa two times for our pool remodel. We are curious of your assessment (quality, longevity of current condition of tile work, etc.) of the work done the second time? Would you recommend bullnose corners in the future? How hard would it be to redo the tile in the future without our new pebble plaster job being disrupted or completely draining the pool?
Thank you very much for your suggestions.


Attachments
Last edited: