Hi guys,
I was wondering if someone could help me? I have a schedule set up to run the pool pump at 1800rpm from 8am to 8pm and then another schedule that runs from 9am to 1pm at 2400rpm, the 9am to 1pm schedule is under the pool circuit. When this schedule runs the SWCG turns on, the other schedule it doesnt turn on. Is there a way to make it so that the SWCG works on this other different ciruit/schedule? I havent figured out if this is possible or not? I assume I might just need to make the 8am to 8pm schedule on the pool ciruit with my lower settings so that the SWCG can run for longer and do the 4 hour skimmer setting at 2400 on the other circuit.
Appreciate any help,
-Nick
I was wondering if someone could help me? I have a schedule set up to run the pool pump at 1800rpm from 8am to 8pm and then another schedule that runs from 9am to 1pm at 2400rpm, the 9am to 1pm schedule is under the pool circuit. When this schedule runs the SWCG turns on, the other schedule it doesnt turn on. Is there a way to make it so that the SWCG works on this other different ciruit/schedule? I havent figured out if this is possible or not? I assume I might just need to make the 8am to 8pm schedule on the pool ciruit with my lower settings so that the SWCG can run for longer and do the 4 hour skimmer setting at 2400 on the other circuit.
Appreciate any help,
-Nick