Hello everyone! I've been maintaining my own pool for 10 yrs now with the help of TFP (thanks!) and have used the Forum as a resource but have never posted before. The pool came with the house that we bought so it's just been a matter of testing and maintaining. Next month I am having a leak repaired that requires a complete draining of the pool and I have never gone through this process before. I am seeking tips on how to get the pool setup after a fresh fill (I didn't find any existing articles about this topic). The pool is plaster, estimated to be 10K gallons, and we use a SWG; CYA is also part of the chemical balance. I was planning to dump in a 2.5 gal jug of chlorine initially to get the chlorine level up quickly, I am a little concerned about starting from a zero level of CYA and what impact that will have on chlorine levels as I add CYA. Thanks for your help.