I would go ahead and get your PH down to 7.2 so it will be ready as soon as you are to SLAM.
Pool Math to the rescue! :super: See the link in my siggy or at the top of every page. This will tell you how much of every thing to add or do.
It tells me that your pool of 30000 with a FC of 4 will need 279 oz of 11% chlorine to get to a FC of 12. Note you can and should change the % to match the % of what you are using.
You can and should go ahead and start your SLAM as soon as you lower you PH to 7.2.
Kim
Pool Math to the rescue! :super: See the link in my siggy or at the top of every page. This will tell you how much of every thing to add or do.
It tells me that your pool of 30000 with a FC of 4 will need 279 oz of 11% chlorine to get to a FC of 12. Note you can and should change the % to match the % of what you are using.
You can and should go ahead and start your SLAM as soon as you lower you PH to 7.2.
Kim
