Still impatiently waiting on the PB
for the 3rd week in a row hope to have the Aquabright done "this week."
Plaster was done yesterday. Today they "prepped " for AB, they reacid washed, to prep the surface, remove the "creme" and give the epoxy and the AB something to stick to. They also taped off the stuff that doesn't want to get melted by the flame.
Epoxy was supposed to go on today but water was weeping into the pool from an edge ... more delays
Yesterday we nearly covered the bottom of the pool to the shallow end, to protect the plaster and keep the pool from "floating" just to have it pumped out today. Today, they didnt bring the right wrench to open the plug at the bottom drain, so we are refilling the pool again, wasting thousands of gallons of water.
Here is an update image or 2
yellow image is during acid wash and the second one is after

The hope is that they will Epoxy tomorrow and AB the next day ? Maybe ?
At this point I just want it DONE ...
Stop the madness.
PB actually said yesterday that he was happy his guys didnt kill my palms ...
They look a little rough from the Freeze this winter but I never dreamed that killing the palms was a possibility ...