hey everyone, first time poster here and hoping I can get some feedback from some of the pool Installers and/or homeowners who know how their bond beam was installed. I’m an architect by trade but pool install is something I’m not familiar with and want to make sure I’m not missing something.
contractor I hired doing a good job so far. Hole is dug and 3/8” stone is set on bottom. They compacted dirt first and then put in stone. All good. Question I have is they plan on using pea gravel for backfill and I know that it is a self compacting material but can not really be compacted so to speak with a compactor. Given this is going to come all the way up, I assume they plan on doing the locking collar/bond beam bearing on this substrate. I am going to have 12” limestone coping and then concrete patio (expansion joint between)
The patio will be set on 3/8” stone. Should I be ok with pea gravel under bond beam or should I stop pea gravel short and add 4” of 3/8” stone on top?
curious if anyone else has done the pea gravel for backfill AND UNDER bond beam
contractor I hired doing a good job so far. Hole is dug and 3/8” stone is set on bottom. They compacted dirt first and then put in stone. All good. Question I have is they plan on using pea gravel for backfill and I know that it is a self compacting material but can not really be compacted so to speak with a compactor. Given this is going to come all the way up, I assume they plan on doing the locking collar/bond beam bearing on this substrate. I am going to have 12” limestone coping and then concrete patio (expansion joint between)
The patio will be set on 3/8” stone. Should I be ok with pea gravel under bond beam or should I stop pea gravel short and add 4” of 3/8” stone on top?
curious if anyone else has done the pea gravel for backfill AND UNDER bond beam