The crew that exposed the pebble came a little later than I expected. I didn’t get to start filling until a little after 3:00 pm. The fill took 9.5 hours, finishing at 12:45 am. Right around 14750 gallons according to the meter before/after. Now just waiting fro them to come out and pull the plugs from the deck canister and the skimmer and turn on the pumps. Let the brushing begin!

Pebble after, dry

Pebble after, underwater (shallow)

After filling


Pebble after, dry

Pebble after, underwater (shallow)

After filling

Last edited: