New here and I think I posted this in the wrong thread before. We are having a fiberglass pool installed and for the most part I feel our installer has followed the best practices I have read on here and elsewhere. They just poured the concrete collar around our new pool and to be honest they didn’t really form it very much. It was just dumped in (Probably 12”x12”) and then they did make sure it was graded away from the pool edge but it is still just a mostly a heap of lumpy concrete. They are going to have an actual concrete company take care of the cantilever pour but my concern now is that the concrete has dried with minor cracks showing in it. I doubt they run all the way through but wondering if I should be concerned? Btw…they are attached the collar to the pool by drilling holes in the lip and using fiberglass pins that are pushed down into the gravel backfill. Thanks in advance for any guidance.