Yes, every thing is correctHave you measured to make sure it is wide, long, deep, etc enough? Add about 6" for the shell and plaster.
Yes, every thing is correctHave you measured to make sure it is wide, long, deep, etc enough? Add about 6" for the shell and plaster.
I’m glad to hear that. I was stressing when the showed at 730 this morning with all the rain forecast!The timing could not be any better! You will not have to water it today! AND your dirt is protected!!! I bet they are beating feet to get as many done as they can before this system hits your area!
Only issue I told PB no ball valves and the red ones are for the bubblers and I'm not sure what the black one is for. The worker I questioned about the ball valves said it was no big deal since all they do is adjust bubbler height and then you never have to touch them again!
YesThat is where the spa wall goes down to the pavers correct?
It is sand. I'll probably add polymeric sand in the future to help with weeds!What is between the spa and decking? Concrete?