Progress so far. Taken much longer than anticipated.
Before - dirt areas were piles of bricks before we finally hauled them off to the dump

Removing sod

Original plan was to run the pool parallel to the house. We changed our mind. that is why so much sod is gone

Leveling took forever and I am still not entirely happy with it.

Note the pile of sod and dirt behind the garage. That is another project.

We decided to go with 1" XPS foam boards. Expensive but more sturdy than 1/2". We used Gorilla tape on all seams.

checked level just for fun. Side to side was level all the way down. Front to back still has a very small drop not sure how much at this point.

Before - dirt areas were piles of bricks before we finally hauled them off to the dump

Removing sod

Original plan was to run the pool parallel to the house. We changed our mind. that is why so much sod is gone

Leveling took forever and I am still not entirely happy with it.

Note the pile of sod and dirt behind the garage. That is another project.

We decided to go with 1" XPS foam boards. Expensive but more sturdy than 1/2". We used Gorilla tape on all seams.

checked level just for fun. Side to side was level all the way down. Front to back still has a very small drop not sure how much at this point.