Plaster was done yesterday. Very happy with the result. Just a couple “specs” of dark marks(debris) on the swimout step. As you can see, the brushing has started.
We had to go out of order and plaster before final grading. My landscaping “friend”?

left me with piles of free dirt, but hasn’t come to spread it with his machine yet. I guess I’m on to option “B” now. I am going to rent a walk behind Bobcat and attempt to grade myself. We have about a 2 foot drop from the front edge of the deck to the lawn.
I assume it’s just drop a bucket of dirt and spread it with the bucket and rakes. Does it need to be tamped prior to sod?
View attachment 327210