Hi
I’m new to above ground pool installation and am looking for advice on leveling and potential water runoff near the pool. The pool is a 16 ft Summer Waves Elite.
We are installing the pool on a slight slope. I made the mistake of not starting my level from the lowest point. I was thinking I could build up the ground at the lowest point and hold the built up ground with landscape timbers. Total build up would be 4 inches. Should I just go ahead and make everything level to the lowest point or will timbers work?
The other question deals with potential water run off. The dug in side is about 8 inches below ground. The water runoff from the high ground comes in from that side. What happens to the runoff water and can it cause issues with the stability of the pool?
Thanks in advance for the help and advice.

I’m new to above ground pool installation and am looking for advice on leveling and potential water runoff near the pool. The pool is a 16 ft Summer Waves Elite.
We are installing the pool on a slight slope. I made the mistake of not starting my level from the lowest point. I was thinking I could build up the ground at the lowest point and hold the built up ground with landscape timbers. Total build up would be 4 inches. Should I just go ahead and make everything level to the lowest point or will timbers work?
The other question deals with potential water run off. The dug in side is about 8 inches below ground. The water runoff from the high ground comes in from that side. What happens to the runoff water and can it cause issues with the stability of the pool?
Thanks in advance for the help and advice.


Last edited: