I live in the NE Pennsylvania area. Was wondering of it would be a good idea to float my steps in the deep end before I place my Duramesh winter cover or remove my steps. I filled them with about 90lbs of sand. My deep end is 8' deep. I would tie them off so there was no movement. Any ideas??? I really do not want to take them out, being so heavy.