Ooh that is bad! The rebar needs cover which they will never be able to get. With any patch work they need to chip all of the loose material out for a good bond of the patch material. I am so sorry you have to go through this. I deal with bridge construction and this would be considered a remove and replace, in my opinion.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.