After a big storm this past Tuesday (Aug 8) that caused some flooding, things dried out and cleared up. Tiling is taking 4 full days, but the tilers are doing a meticulous and awesome job.
Pic after the storm. I used a pump the contractors had to pump out the water
View attachment 67731
Grouting and trim tile should be completed on Monday
View attachment 67732
Rolled edge spa tiling is looking great:
View attachment 67733
We almost picked that spa tile but changed our minds after seeing more samples. It is nice to see it in a big swatch. It does look good, hopefully the one we picked looks good also once installed. So far have only seen it in boxes for the 1"x1"
We are doing dark walnut travertine for coping and deck.